1. Before sending operation. Make sure all kind of switch on the machine tool, knobs, handles, protective device, movable parts at the right position, make sure no other personnel in possible dangerous position, otherwise do not power operation, do not hold the main power switch with wet hands.
2. Place the lightning symbol on the electrical equipment, indicating that there is a high voltage, and do not touch them under any circumstances.
3. Remember the position of the emergency stop button so that it can be pressed quickly when necessary.
4. In the process of machine tool operation, do not touch the any had no intention of meaning by hunger
5. In the process of machine tool operation, is absolutely not allowed or other items with the hand contact or run of machine components, such as spindle, chuck, cutting tool, workpiece, screw, polished rod, workbench, drag board, slip board, etc., so as to avoid unexpected accidents. 
6. For machine tools with more than one operation, be sure to confirm the location of the partner during the conversion operation and inform him to leave the dangerous position.  
7. In case of power failure in operation, the main power supply should be turned off quickly, and the electrical knobs and the machine arm should be placed in a safe position such as zero or middle position.

1.送电操作前.要确认机床上的各种开关、旋纽、手柄、防护装置、可移动部件在正确位,确认没有其他人员处在可能发生危险的位置,否则不可送电操作、不许用湿手操主电源开关. 
2.对电气设备上贴有闪电标志的位置,表明存在有高压,任何情况下都不要触碰它们
3.记住急停按钮的位置,以便在必要时迅速按下它。
4.在机床运行过程中,不要无意意触碰任何按饥
5.在机床运行过程中,绝对不允许用手或其他物品接触旋转或运行中的机床部件,如主轴、卡盘、刀具、工件、丝杠、光杆、工作台、拖板、溜板等,以免发生意想不到的事故。 
6. 对于不止一人操作的机床,在转换操作时,一定要确认伙伴的位置,并通知他离开危险位置。 
7.操作中如果发生断电情况,应迅速关闭主电源,并将电气旋纽和机 械手栖置于零位或中位等安全位置。